RecordU9 Statusin force Builtdesigned, not built Decided2026-09-28 by the user The context budget is a ratio of the model window The context budget is configurable; its default is 45% of the model window (a ratio setting, not a fixed number), and the configured budget or ratio is the single source of truth. Refined by Q11.