Developer preview. Not production-ready, not audited, not for sensitive code. Read the limits

Record
U9
Status
in force
Built
designed, not built
Decided
2026-09-28 by the user

The context budget is a ratio of the model window

The context budget is configurable; its default is 45% of the model window (a ratio setting, not a fixed number), and the configured budget or ratio is the single source of truth. Refined by Q11.

Search the documentation

Type to search the curated record.

↑↓ move Enter open Esc close