Developer preview. Not production-ready, not audited, not for sensitive code. Read the limits

Record
CRED-EXFIL
Status
in force
Built
designed, not built
Decided
2026-09-28 by the user

Exfiltration control starts with per-use approval

Phase 1 asks the user to approve each use of a credential, configurable through the shared scopes (per use, per run, per conversation, remembered per host and use). Egress hardening (an egress lock or proxy) is deferred to a later phase; the design keeps a clean extension path for it. The approval is the generic approval primitive of UR-04.

Search the documentation

Type to search the curated record.

↑↓ move Enter open Esc close